- Locating at Castle Peak Road – Castle Peak Bay, the traditional luxury residential district
- Golden beach, Premium Resort, Yacht club are located ahead and close to the international renowned education institution
- Coastal living is at your fingertips
1.This photograph was taken above the air near Castle Peak Transmitting Station by drone on 23 January 2020 and has been integrated and colour fine-tuned with computerized imaging techniques with light beams indicating the approximate location of the residential buildings of the phase “Seacoast Royale” upon completion, in order to show the approximate surrounding areas of the phase “Seacoast Royale”. Please note that there may be changes or future changes to the surrounding areas of the phase “Seacoast Royale” and the other phases of “The Royale”. The Tuen Mun – Chek Lap Kok Link, Tuen Mun South Extension project of West Rail Line and Lantau Tomorrow Vision with light beams indicating the approximate location shown on the photograph are the approximate locations of those infrastructure projects and are for reference only. The vendor does not give any promise or warranty in any forms regarding whether those infrastructure projects will be completed, and the information about its corresponding planned routes as well as completion dates, etc. The route with light beam does not represent the actual situation. The Hong Kong Port of Hong Kong-ZhuHai-Macao Bridge, Hong Kong International Airport, Tuen Mun Station (West Rail Line) with light beams indicating the approximate location shown on the photograph are the approximate locations of those infrastructure projects and are for reference only. The names of the infrastructure projects, road, attractions and facilities shown on the photograph are the approximate locations of the infrastructure projects, road, attractions and facilities, and are for reference only. 2. Source:https://www.hzmb.hk/tchi/about_overview_04.html (May 2020) The vendor does not give any promise or warranty in any forms regarding whether Tuen Mun – Chek Lap Kok Link will be completed, and the information about its corresponding planned routes as well as completion dates, etc. 3. Source:https://www.info.gov.hk/gia/general/202005/29/P2020052900370.htm The vendor does not give any promise or warranty in any forms regarding whether Tuen Mun South Extension project will be built, and the information about its corresponding planned routes as well as completion dates, etc. 4.Source:https://www.hk2030plus.hk/TC/document/2030+_Pamphlet_Chinese.pdf and https://www.legco.gov.hk/yr18-19/chinese/panels/dev/papers/dev20190326cb1-729-3-c.pdf (May 2020) The vendor does not give any promise or warranty in any forms regarding whether Lantau Tomorrow Vision will be built, and the information about its corresponding planned routes as well as completion dates, etc. 5. This estimated travelling time is assessed by Google Maps information (10 July 2020), it will be varied due to actual traffic situation and the travelling time may be longer.6.This photograph was taken above the air near Phase 1 “Seacoast Royale” of “The Royale” by drone on 12 April 2020 and has been integrated and colour fine-tuned with computerized imaging techniques with light beams indicating the approximate location of the residential buildings of the phase “Seacoast Royale” upon completion, in order to show the approximate surrounding areas of the phase “Seacoast Royale”. Please note that there may be changes or future changes to the surrounding areas of the phase “Seacoast Royale” and the other phases of “The Royale”.
This photograph was taken above the air near Phase 1 “Seacoast Royale” of “The Royale” by drone on 12 April 2020 and has been integrated and colour fine-tuned with computerized imaging techniques with light beams indicating the approximate location of the residential buildings of the phase “Seacoast Royale” upon completion, in order to show the approximate surrounding areas of the phase “Seacoast Royale”. Please note that there may be changes or future changes to the surrounding areas of the phase “Seacoast Royale” and the other phases of “The Royale”.
1. This area is calculated and provided by the authorized person for the phase on the basis of the latest approved building plans. For the details of clubhouse area, please refer to the sales brochure. The area of clubhouse as specified above is for serving the whole Development comprising Phase 1, Phase 2 and Phase 3. Common facilities of all phases are intended for the common use and the benefit of the owner of residential units and their bona fide visitors of all phases. Please refer to the Deed of Mutual Covenant for details.
2. This area is calculated and provided by the authorized person for the phase on the basis of the latest approved building plans. For the details of communal garden or play area, please refer to the sales brochure. The area of communal garden or play area as specified above is for the whole Development comprising Phase 1, Phase 2 and Phase 3. Common facilities of all phases are intended for the common use and the benefit of the owner of residential units and their bona fide visitors of all phases. Please refer to the Deed of Mutual Covenant for details.
3. The above photograph is a stock photograph. It does not represent any part of the phase “Seacoast Royale” or its actual view. The vendor reserves the right to make modifications and changes according to actual circumstances without prior notice.
1. The above photograph is a stock photograph. It does not represent any part of the phase “Seacoast Royale” or its actual view. The vendor reserves the right to make modifications and changes according to actual circumstances without prior notice.
*The above kitchen & bathroom fittings and appliances brands are not applicable to all units, please check with sales person for details.
1. The above photograph is a stock photograph. It does not represent any part of the phase “Seacoast Royale” or its actual view. The vendor reserves the right to make modifications and changes according to actual circumstances without prior notice.
2. The floor-to-floor height mentioned above is the mode of all figures calculated within the residential property. The floor-to-floor height of each residential property may be varied due to difference in floor level, spatial layout and architectural structure and it may include different figures of floor-to-floor height within the same property.
3. The main door lock shown here is a stock photograph. It does not represent the actual provision or any part of the phase “Seacoast Royale” and is for reference only. The vendor undertakes that if the specified brand name or model number are not installed in the phase, appliances of comparable quality will be installed.
4. The photograph was taken on 6 July 2020 at sales office unmodified show flat of Flat 27, 16/F, Tower 3 and has been integrated and colour fine-tuned with computerized imaging techniques. The design will be varied due to different spatial layouts of different residential properties. It is not applicable to all residential properties and is for reference only. The vendor reserves the right to make modifications and changes according to actual circumstances without prior notice.
Name of the Phase of the Development: Phase 1 (“the Phase”) of The Royale is called “Seacoast Royale” District: Tuen Mun
Name of Street and Street Number of the Phase:8 Castle Peak Road-Castle Peak Bay
The website address designated by the vendor for the Phase: www.seacoastroyale.com.hk
Vendor: Win Standard Enterprises Limited (also as the owner and whose holding company is Charmondy Investment Limited). Authorized Person for the Phase: Mr. Yuen Cheuk Yiu of Wong Tung & Partners Limited (Mr. Yuen Cheuk Yiu is the Managing Director of Wong Tung & Partners Limited). Building contractor for the Phase: Aggressive Construction Engineering Limited. Vendor’s solicitors: Lo & Lo and Iu, Lai & Li. Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Hang Seng Bank Limited, The Hongkong and Shanghai Banking Corporation Limited and The Bank Of East Asia, Limited. (Note: The relevant loan has been fully repaid.) Any other person who has made a loan for the construction of the Phase: Not Applicable.
These video were taken at the unmodified show flats of Flat 16, 25, 27 on 16/F of Tower 3 in “Seacoast Royale” sales office on 29th July 2020 to show the interior of the show flat. It has been integrated and retouched with computerized imaging techniques. The content, view and facilities shown in the video is for reference only. The vendor reserves the right to make modification and changes according to the actual circumstances without prior notice. The description, reference, photo, drawing, image or other information whatsoever in this advertisement/promotional material shall not constitute or be construed as constituting any offer, promise, representation or warranty, whether expressed or implied. All information contained in this advertisement/promotional material shall be subject to the final plans approved by the relevant Government authorities. Prospective purchasers should make reference to the sales brochure for details of the phase. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby. This advertisement is published by, or with the consent of, the vendor. Please refer to the sales brochure for details. Date of production of this advertisement: 30th September 2024.
Seacoast Royale unmodified show flat virtual Tour of Flat 16 on 16/F of Tower 3
Name of the Phase of the Development: Phase 1 (“the Phase”) of The Royale is called “Seacoast Royale” District: Tuen Mun
Name of Street and Street Number of the Phase:8 Castle Peak Road-Castle Peak Bay
The website address designated by the vendor for the Phase: www.seacoastroyale.com.hk
Vendor: Win Standard Enterprises Limited (also as the owner and whose holding company is Charmondy Investment Limited). Authorized Person for the Phase: Mr. Yuen Cheuk Yiu of Wong Tung & Partners Limited (Mr. Yuen Cheuk Yiu is the Managing Director of Wong Tung & Partners Limited). Building contractor for the Phase: Aggressive Construction Engineering Limited. Vendor’s solicitors: Lo & Lo and Iu, Lai & Li. Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Hang Seng Bank Limited, The Hongkong and Shanghai Banking Corporation Limited and The Bank Of East Asia, Limited. (Note: The relevant loan has been fully repaid.) Any other person who has made a loan for the construction of the Phase: Not Applicable.
This video was taken at the unmodified show flat of Flat 16 on 16/F of Tower 3 in “Seacoast Royale” sales office on 29th July 2020 to show the interior of the show flat. It has been integrated and retouched with computerized imaging techniques. The content, view and facilities shown in the video is for reference only. The vendor reserves the right to make modification and changes according to the actual circumstances without prior notice. The description, reference, photo, drawing, image or other information whatsoever in this advertisement/promotional material shall not constitute or be construed as constituting any offer, promise, representation or warranty, whether expressed or implied. All information contained in this advertisement/promotional material shall be subject to the final plans approved by the relevant Government authorities. Prospective purchasers should make reference to the sales brochure for details of the phase. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby. This advertisement is published by, or with the consent of, the vendor. Please refer to the sales brochure for details. Date of production of this advertisement: 30th September 2024.
Name of the Phase of the Development: Phase 1 (“the Phase”) of The Royale is called “Seacoast Royale” District: Tuen Mun
Name of Street and Street Number of the Phase:8 Castle Peak Road-Castle Peak Bay
The website address designated by the vendor for the Phase: www.seacoastroyale.com.hk
Vendor: Win Standard Enterprises Limited (also as the owner and whose holding company is Charmondy Investment Limited). Authorized Person for the Phase: Mr. Yuen Cheuk Yiu of Wong Tung & Partners Limited (Mr. Yuen Cheuk Yiu is the Managing Director of Wong Tung & Partners Limited). Building contractor for the Phase: Aggressive Construction Engineering Limited. Vendor’s solicitors: Lo & Lo and Iu, Lai & Li. Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Hang Seng Bank Limited, The Hongkong and Shanghai Banking Corporation Limited and The Bank Of East Asia, Limited. (Note: The relevant loan has been fully repaid.) Any other person who has made a loan for the construction of the Phase: Not Applicable.
These video were taken at the unmodified show flats of Flat 16, 25, 27 on 16/F of Tower 3 in “Seacoast Royale” sales office on 29th July 2020 to show the interior of the show flat. It has been integrated and retouched with computerized imaging techniques. The content, view and facilities shown in the video is for reference only. The vendor reserves the right to make modification and changes according to the actual circumstances without prior notice. The description, reference, photo, drawing, image or other information whatsoever in this advertisement/promotional material shall not constitute or be construed as constituting any offer, promise, representation or warranty, whether expressed or implied. All information contained in this advertisement/promotional material shall be subject to the final plans approved by the relevant Government authorities. Prospective purchasers should make reference to the sales brochure for details of the phase. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby. This advertisement is published by, or with the consent of, the vendor. Please refer to the sales brochure for details. Date of production of this advertisement: 30th September 2024.
Seacoast Royale unmodified show flat virtual Tour of Flat 25 on 16/F of Tower 3
Name of the Phase of the Development: Phase 1 (“the Phase”) of The Royale is called “Seacoast Royale” District: Tuen Mun
Name of Street and Street Number of the Phase:8 Castle Peak Road-Castle Peak Bay
The website address designated by the vendor for the Phase: www.seacoastroyale.com.hk
Vendor: Win Standard Enterprises Limited (also as the owner and whose holding company is Charmondy Investment Limited). Authorized Person for the Phase: Mr. Yuen Cheuk Yiu of Wong Tung & Partners Limited (Mr. Yuen Cheuk Yiu is the Managing Director of Wong Tung & Partners Limited). Building contractor for the Phase: Aggressive Construction Engineering Limited. Vendor’s solicitors: Lo & Lo and Iu, Lai & Li. Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Hang Seng Bank Limited, The Hongkong and Shanghai Banking Corporation Limited and The Bank Of East Asia, Limited. (Note: The relevant loan has been fully repaid.) Any other person who has made a loan for the construction of the Phase: Not Applicable.
This video was taken at the unmodified show flat of Flat 25 on 16/F of Tower 3 in “Seacoast Royale” sales office on 29th July 2020 to show the interior of the show flat. It has been integrated and retouched with computerized imaging techniques. The content, view and facilities shown in the video is for reference only. The vendor reserves the right to make modification and changes according to the actual circumstances without prior notice. The description, reference, photo, drawing, image or other information whatsoever in this advertisement/promotional material shall not constitute or be construed as constituting any offer, promise, representation or warranty, whether expressed or implied. All information contained in this advertisement/promotional material shall be subject to the final plans approved by the relevant Government authorities. Prospective purchasers should make reference to the sales brochure for details of the phase. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby. This advertisement is published by, or with the consent of, the vendor. Please refer to the sales brochure for details. Date of production of this advertisement: 30th September 2024.
Name of the Phase of the Development: Phase 1 (“the Phase”) of The Royale is called “Seacoast Royale” District: Tuen Mun
Name of Street and Street Number of the Phase:8 Castle Peak Road-Castle Peak Bay
The website address designated by the vendor for the Phase: www.seacoastroyale.com.hk
Vendor: Win Standard Enterprises Limited (also as the owner and whose holding company is Charmondy Investment Limited). Authorized Person for the Phase: Mr. Yuen Cheuk Yiu of Wong Tung & Partners Limited (Mr. Yuen Cheuk Yiu is the Managing Director of Wong Tung & Partners Limited). Building contractor for the Phase: Aggressive Construction Engineering Limited. Vendor’s solicitors: Lo & Lo and Iu, Lai & Li. Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Hang Seng Bank Limited, The Hongkong and Shanghai Banking Corporation Limited and The Bank Of East Asia, Limited. (Note: The relevant loan has been fully repaid.) Any other person who has made a loan for the construction of the Phase: Not Applicable.
These video were taken at the unmodified show flats of Flat 16, 25, 27 on 16/F of Tower 3 in “Seacoast Royale” sales office on 29th July 2020 to show the interior of the show flat. It has been integrated and retouched with computerized imaging techniques. The content, view and facilities shown in the video is for reference only. The vendor reserves the right to make modification and changes according to the actual circumstances without prior notice. The description, reference, photo, drawing, image or other information whatsoever in this advertisement/promotional material shall not constitute or be construed as constituting any offer, promise, representation or warranty, whether expressed or implied. All information contained in this advertisement/promotional material shall be subject to the final plans approved by the relevant Government authorities. Prospective purchasers should make reference to the sales brochure for details of the phase. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby. This advertisement is published by, or with the consent of, the vendor. Please refer to the sales brochure for details. Date of production of this advertisement: 30th September 2024.
Seacoast Royale unmodified show flat virtual Tour of Flat 27 on 16/F of Tower 3
Name of the Phase of the Development: Phase 1 (“the Phase”) of The Royale is called “Seacoast Royale” District: Tuen Mun
Name of Street and Street Number of the Phase:8 Castle Peak Road-Castle Peak Bay
The website address designated by the vendor for the Phase: www.seacoastroyale.com.hk
Vendor: Win Standard Enterprises Limited (also as the owner and whose holding company is Charmondy Investment Limited). Authorized Person for the Phase: Mr. Yuen Cheuk Yiu of Wong Tung & Partners Limited (Mr. Yuen Cheuk Yiu is the Managing Director of Wong Tung & Partners Limited). Building contractor for the Phase: Aggressive Construction Engineering Limited. Vendor’s solicitors: Lo & Lo and Iu, Lai & Li. Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Hang Seng Bank Limited, The Hongkong and Shanghai Banking Corporation Limited and The Bank Of East Asia, Limited. (Note: The relevant loan has been fully repaid.) Any other person who has made a loan for the construction of the Phase: Not Applicable.
This video was taken at the unmodified show flat of Flat 27 on 16/F of Tower 3 in “Seacoast Royale” sales office on 29th July 2020 to show the interior of the show flat. It has been integrated and retouched with computerized imaging techniques. The content, view and facilities shown in the video is for reference only. The vendor reserves the right to make modification and changes according to the actual circumstances without prior notice. The description, reference, photo, drawing, image or other information whatsoever in this advertisement/promotional material shall not constitute or be construed as constituting any offer, promise, representation or warranty, whether expressed or implied. All information contained in this advertisement/promotional material shall be subject to the final plans approved by the relevant Government authorities. Prospective purchasers should make reference to the sales brochure for details of the phase. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby. This advertisement is published by, or with the consent of, the vendor. Please refer to the sales brochure for details. Date of production of this advertisement: 30th September 2024.
Name of the Phase of the Development: Phase 1 (“the Phase”) of The Royale is called “Seacoast Royale” District: Tuen Mun
Name of Street and Street Number of the Phase:8 Castle Peak Road-Castle Peak Bay
The website address designated by the vendor for the Phase: www.seacoastroyale.com.hk
The photographs, images, drawings or sketches shown in this advertisement/promotional material represent an artist’s impression of the development concerned only. They are not drawn to scale and/or may have been edited and processed with computerized imaging techniques. Prospective purchasers should make reference to the sales brochure for details of the development. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby.
Vendor: Win Standard Enterprises Limited (also as the owner and whose holding company is Charmondy Investment Limited). Authorized Person for the Phase: Mr. Yuen Cheuk Yiu of Wong Tung & Partners Limited (Mr. Yuen Cheuk Yiu is the Managing Director of Wong Tung & Partners Limited). Building contractor for the Phase: Aggressive Construction Engineering Limited. Vendor’s solicitors: Lo & Lo and Iu, Lai & Li. Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Hang Seng Bank Limited, The Hongkong and Shanghai Banking Corporation Limited and The Bank Of East Asia, Limited. (Note: The relevant loan has been fully repaid.) Any other person who has made a loan for the construction of the Phase: Not Applicable. All information contained in this advertisement/promotional material shall be subject to the final plans approved by relevant Government authorities and legal documentation. The vendor reserves the right to make modifications and changes according to actual circumstances without prior notice. The description, reference, photograph, drawing, image or other information whatsoever in this advertisement / promotional material shall not constitute or be construed as constituting any offer, promise, representation or warranty, whether express or implied.
This advertisement is published by, or with the consent of, the vendor. Please refer to the sales brochure for details. Date of production of this advertisement: 30th September 2024.